Amirah Equipment Rental supplies mobile cranes for rent in ICAD — hydraulic mobile, rough-terrain and truck-mounted cranes supplied with certified operators for lifting and rigging. Delivered across ICAD with certified operators available and flexible daily, weekly and monthly terms, backed by World Star Holding.
Mobile Crane types available in ICAD
- Rough-terrain cranes — on-site lifting on prepared ground
- All-terrain mobile cranes — road-mobile heavy lifts
- Truck-mounted (Hiab) cranes — loading and utility lifts
Why rent mobile cranes from Amirah in ICAD
For fabricators, contractors and logistics operators in ICAD (Industrial City of Abu Dhabi), we supply site and yard equipment with quick turnaround from our nearby Mussafah base. Our owned, well-maintained fleet is ready for steel erection, precast placement, equipment lifting and rigging, with operator support for ADNOC, EPC and government project sites.
How much does Mobile Crane rental cost in ICAD?
Rates depend on the Mobile Crane size, rental duration and whether operator support and delivery are required. Call +971 2 886 9999 or request a quote for same-day ICAD pricing.
Do mobile cranes come with an operator and rigger?
Yes — mobile cranes are supplied with a certified operator, and rigging/banksman support can be arranged with your lift plan.
What lifting capacities do you offer?
Our crane fleet spans a broad range of capacities and reaches. Share the load weight, radius and height and we’ll size the right crane.
Mobile Crane rental across the UAE
Also available in: Mobile Crane Rental in Abu Dhabi · Mobile Crane Rental in Mussafah · Mobile Crane Rental in KIZAD · Mobile Crane Rental in Al Ain.
Other equipment in ICAD: Excavator Rental in ICAD · Boom Lift Rental in ICAD · Scissor Lift Rental in ICAD · Forklift Rental in ICAD.
Mobile Cranes we rent — sizes and capacities
Our mobile crane fleet spans 25 to 100 tonnes. As a rule of thumb, pick the capacity by the heaviest lift AND the radius it must reach — capacity drops sharply as the boom extends.
| Capacity | Typical work | Best suited to |
|---|---|---|
| 25 tonne | Steel erection, precast setting, plant moves | Tighter urban and industrial yards |
| 50 tonne | Structural steel, tank and vessel lifts | Mid-rise construction, factories |
| 70 tonne | Heavy structural and mechanical installation | Industrial plants, infrastructure |
| 80 tonne | Long-radius and heavy component lifts | Oil & gas, large infrastructure |
| 100 tonne | Maximum-capacity and long-reach lifting | Major EPC and plant projects |
Not sure which size fits your site? Send us the load, reach and ground conditions on the quote form and we'll recommend the right machine.
Mobile cranes for ICAD I, II and III
The Industrial City of Abu Dhabi sits directly beside our Mussafah base, so ICAD deliveries are among the quickest we make — often under 30 minutes gate to gate. That proximity matters in ICAD because most facilities run controlled gates: we time the truck to your gate-pass window and send operator documents ahead so mobile cranes go straight to work instead of waiting at security.
ICAD work is heavy industry — structural steel, pipe spooling, precast, cable and drum handling — and shift-driven. We support night-shift deliveries and swap-outs between shifts, and for long-running plant contracts we can station equipment on site with scheduled service visits rather than repeated mobilisation.
- Under-30-minute typical delivery from the adjacent Mussafah yard
- Gate-pass timing and operator HSE documents handled in advance
- Night-shift and shift-change delivery slots supported
- On-site stationing with scheduled servicing for plant contracts
Ready to book? Request a quote for Mobile Crane Rental in ICAD or browse the full equipment rental fleet. Working elsewhere too? See Mobile Crane Rental in Abu Dhabi.
Can you deliver mobile cranes to a gated ICAD facility?
Yes — most of our ICAD deliveries are into gated plants. Share the facility's gate-pass procedure and HSE requirements when you book and we will submit operator IDs, insurance and machine documents ahead of the delivery window so entry is not delayed.
